Please select your home edition
Edition
Henri-Lloyd - For the Obsessed

Panama Canal Transit

by Hugh and Heather Bacon 27 Feb 2018 20:23 UTC
The canal approach © Hugh and Heather Bacon

We are very excited to announce a new series of articles in Currents for 2017: Memories of a Circumnavigation. This series will recount the adventures of Argonauta I, from when they began their journey in 1997 in the Caribbean, until the completion of the circumnavigation in 2006, when they crossed their 1997 outbound Caribbean track.

In early 1999, we arrived at the Panama Canal, having spent the previous couple of years making our way from The British Virgin Islands via the Island Chain, Venezuela and Columbia to Panama. Enroute we had upgraded, and modified Argonauta I from a basic coastal cruiser to a bluewater capable vessel, with all the systems essential to a circumnavigation: rigging, sails, electrics, electronics, steering, and support systems such as a watermaker and freezer. Perhaps as importantly, in the two or so years taken to reach the Canal, we had gained confidence in both the yacht and ourselves and felt ready to undertake a serious ocean passage.

February 27, 1999, we arrived in Puerto Cristóbal, the Atlantic terminus for the Panama Canal. We anchored about a mile off the North/South path to the Gatun Locks, the first set for a south bound transit. Peculiarities of geography result in a North/South axis of the Canal, not East/West as one might imagine. The three Gatun Locks will raise Argonauta I 85 feet to Gatun Lake. It is 31 miles from the Gatun Locks across the lake to the Pedro Miguel lock. Here we enter Miraflores Lake, where we will leave the boat for a month at the Pedro Miguel Boat Club, while we fly to Canada for a brief visit. At that time, one could opt for a mid-passage stay at the Boat Club, which was an R & R fixture for the American Military contingent at the Canal. It is now closed. Once we returned, we would do final provisioning and down lock into the Pacific via the Miraflores Locks.

At our anchorage, Area AF@, known as the AFlats@, there were about 50 yachts, mostly awaiting transit or resting from a recent northbound transit. To our surprise, we found Area AF@ quite pleasant, as it is well away from the port, with an undeveloped shoreline studded with palms. It is a short dinghy ride to the Panama Canal Yacht Club, the gathering place at the time for all yachties. Now yachts gather at nearby Shelter Bay Marina. We planned to use an agent for all formalities as opposed to running around to various offices as most yachties do. That is because we could get a suitable transit date more easily, as well as obtaining the necessary clearance for a mid-transit stop over. While we awaited transit arrangement in Cristóbal, we had the sails maintained and stocked nonperishable provisions.

Our two 25 gallon Nauta flex tanks secured to the deck provided excellent reserve tankage for diesel. With 50 gallons on deck plus two 6 gallon jerry jugs, we arrived here from Cartagena after seven weeks with a full main tank (50 gal) plus one full jerry jug. (Fuel transfer was by siphoning). The 100 gallon-plus capacity gave us a motoring range of about 700 NM. For the transit, the now empty flex tanks were folded up and stowed, to be filled at Pedro Miguel. With a bit of preventive maintenance, we were ready to head into the Pacific. We hoped for a smooth Canal transit.

Friday, March 5, we learned that we were scheduled to transit beginning at 0530 hours Saturday morning. I had earlier recruited four line handlers to manage our four, 125 foot lines needed to stabilize the boat in the locks. All the line handlers intended to transit their vessels within a week or so and wanted firsthand experience in the Canal. So our crew assembled onboard Argonauta I at 0515 hrs. Over sticky buns and coffee, we provided a boat check-out for our line handlers and then we set up the lines. I had earlier acquired four tires, which I wrapped in garbage bags as extra fenders. That made it six fenders per side and I kept spare fenders available on deck for emergency use. Ideas from our line handlers resulted in our fixing a snatch block at each line position to accommodate the up to 70 degree angle we expected the lines to reach, as they are drawn up to the top of the lock some 40 to 50 feet above. Also, we ran the crucial aft lines forward to the Genoa winches to overcome anticipated extreme forces.

Our Pilot was delivered by the Pilot Boat at 0600h. He checked and approved our setup and advised we would be transiting as a three vessel nest. Appledore III, a 60 foot classic schooner would be centre, I chose to be on the starboard and a 50 foot Costa Rican Hatteras smoke pot, Nauti Lady, ended up on the port side. At the time, the name did not have any significance, but later events showed she was aptly named! We joined up short of the Gatun Locks, secured bow, stern and spring lines and entered the lock. The configuration meant that only our two starboard long lines would be run to the lock, while our port side was given over to securing to Appledore III. Nauti Lady of course, had their port long lines to the lock. Appledore III had no lines to the lock. Thus transformed into one vessel, the Panama Canal Pilot on Appledore III would navigate and call power changes for all three vessels.

We entered the lock behind a huge, multi-thousand ton freighter, the lock line handlers above threw down the monkey-fisted pickup lines, which were secured to the boat lines so that they could be fixed to bollards at the top of the lock. Tension was taken up by line handlers on the two outboard yachts, lock doors were closed and water entered to raise us up about 40 feet in the first of the three Gatun Locks.. In the first few minutes there was a major emergency! Nauti Lady's port stern lock line parted and seconds later their port bow lock line also parted. Instantly, we began to close on the starboard lock wall. With us on the inside, the possibility of major damage to Argonauta I was only seconds away! The nest was now heading bow in to the wall, so I immediately came in with full power and full left rudder. I was able to rotate the nest parallel to the wall and slow our movement towards it.

At the same time, I ordered all extra fenders placed by hand on our starboard side. Appledore III's crew leapt over with more fenders and with my use of power, we soft landed against the sidewall of the lock. Line handlers pushed against the lock side to hold us off. While fenders were completely compressed, the tires provided minimal separation. Our lower port spreader came within four to six inches of the wall.

Thanks to prompt action on everyone's part, we suffered no damage to either hull or rigging. We later learned that Nauti Lady's lines had been rented. They were hemp, not nylon and obviously rotted. Appledore III provided two of their lines for the remaining locks. We passed through these two without further incident, entering Gatun Lake 85 feet above sea level at 1000 hours. There, the nest untied and proceeded individually. We sailed and motored the 31 odd miles to the Pedro Miguel Lock. Our pilot directed us via a shortcut called the Banana Cut. We reached the Pedro Miguel locks at 1400 hrs. Here yachts enter ahead of the large ship.

Poor communication between the lockmaster and our pilot resulted in a close squeeze between the bow of the freighter and the lock entrance. As the freighter was slowly closing the gap, we found ourselves in a nerve rending sprint to enter the lock. I was too close to abort the entry! We squeaked in to cheers from those on shore and the odd scream from those on board! Once in the lock, we slowed, tied to a tugboat, and down locked into Miraflores Lake. We docked at the Boat Club by 1600 hours, more than a little relieved to be unscathed. Once secured, we left for Canada.

While in Canada and just two days prior to departure, we received news that Argonauta I had been damaged due to tug wash. Her mast had tangled with a neighboring ketch's triatic stay, cleaning off our wind transducer, masthead light, one spinnaker sheave and damaging the relative wind indicator. I was able to source replacement parts before we returned, (I delayed our return flight by two days) which obviated hours of long distance calls.

We arrived back at the yacht April 29. Damage to the mast head was as reported. Evidently, tug wash caused an out of synch roll. I had checked conflict possibilities carefully before we departed, but did not put the necessary thought to danger posed by a triatic stay in an out of synch roll caused by reflected wash from shore. This reportedly happened only once in the nearly seven weeks we were away! It was super bad luck but not a show stopper. With replacement items enroute, I was hopeful repairs could be completed in a week or two. Excellent local support meant we were soon repaired and fueled up ready to down-lock into the Pacific. This we did without incident on Sunday, May 16, 1999.

Once in saltwater, we dropped off line handlers in Balboa and headed for Taboga Island just north of the ship anchorage. There we completed a final systems check before heading for the Galapagos. We were on our own to Australia. Lots of adventure was ahead.

This article has been provided by the courtesy of Bluewater Cruising Association.

Related Articles

Wildlife Encounters – Sea to Sky
You just never know what you are going to see You just never know what you are going to see. That is an oft-heard sentence aboard Hoku Pa'a, usually said with wonder and joy as we reflect on the latest interesting sight, courtesy of Mother Nature. Posted on 10 Dec 2023
Tips and Tricks
A few tricks that aren't generally covered by the excellent courses offered by BCA In my travels to Alaska, Mexico, and two return trips to Hawaii, I have learned a few tricks that aren't generally covered by the excellent courses offered by BCA. Posted on 6 Nov 2023
Topolabampo to Alamos
A great sail from the islands off Puerto Escondido, Baja, to Topolobampo, Mexico We had a great sail from the islands off Puerto Escondido, Baja, to Topolobampo, Mexico. This crossing was bittersweet as we bid goodbye to our dear friends Bruce and Gina on Dreamcatcher. Posted on 15 Aug 2023
Rookie mistakes - And the things we did right!
We departed BC last fall, headed for our first year of long-term cruising We departed BC last fall, headed for our first year of long-term cruising, foolishly believing that we had read enough, learned enough, knew enough to avoid the mistakes that many new cruisers make - we were so wrong!!! Posted on 13 Aug 2023
Vancouver Island Cruising Experience (VICE) 2023
There is no preparation for going offshore quite like being offshore There is no preparation for going offshore quite like being offshore. You can do this by joining VICE 2023 (Vancouver Island Cruising Experience). Posted on 8 Jun 2023
Docking Theory & Practice
Do you find some docking conditions challenging? Do you find some docking conditions challenging? Whether you are a single-handed sailor, an inexperienced crew or a confident helmsman, you will grow new skills and turn your boat handling and communication from stress to success. Posted on 31 Mar 2023
January: Reflections on a Pandemic Escape
The Sars-Covid pandemic had again eluded all the attempts to stop it altogether As the festive season proceeded through the last days of December and the hoary Old Man gave over his powers to the bright shiny Newborn of 2022, we on Traversay III shared the very same, strangely inexorable feelings of powerlessness. Posted on 11 Mar 2023
10 more things learned while sailing to Mexico
The learning never stops One of the great things about sailing is that the learning never stops. Even at home in familiar waters, we'd learn new things every year. Now that we're voyaging, the lessons are coming much faster. Posted on 14 Jan 2023
Our planetary system from a sailor's perspective
Event in Canada: Navagating with the stars This in-person presentation at the BCIT Planetarium is for everyone and anyone who has looked at stars and wondered how anyone could use their location to navigate with. Posted on 13 Jan 2023
Electrical Skills for Cruisers
Spend a day with electrical engineer, Bjarne Hansen Spend a day with electrical engineer, Bjarne Hansen, in an interactive session about all things boat electrical. Posted on 30 Dec 2022
GJW Direct - Yacht 2019 - FooterCrewsaver 2021 Safetyline FOOTERCure Marine - Cure 55 - FOOTER